-
Engineering Mode of study: Full-time Project description: Tata Steel’s Building Systems UK (BSUK) business manufactures a range of insulating sandwich panel products for building façades. With a design life of
-
intelligibility in noise, but this is not reflected in the patient reported outcomes. Why is there a discrepancy between these two measures on BB performance and how may this inform device/software design? Through
-
quantity of possible data permutations, manual testing of the scheme plan data preparation system is a laborious process. To avoid that we aim at an alternative approach, via the automated generation of test
-
for Harvesting Assistance Swansea University, an internationally recognised academic institution with strong commitments to research and technological innovation, seeks applications for a PhD scholarship funded